The installation date was 15.12.2022. Moorings are checked at a minimum every three months. Each mooring is checked for the following:
- Mooring Buoy flotation, ingress of water, and fouling
- Pickup line buoy flotation and fouling
- Buoy attachment to mainline
- Fouling of line
- Rope and splicing integrity
- Swivel fouling/seizure
- Shackle–pin placement
- Shackle mousing checked / replaced